English > Business > Project General Contracting > Bridge Engineering > Guangzhou-Shenzhen Expressway Hezhou Interchange Reconstruction Project

Guangzhou-Shenzhen Expressway Hezhou Interchange Reconstruction Project

2024年10月09日     79人浏览

Hezhou interchange reconstruction project is located at the intersection of Guangzhou-Shenzhen Expressway and Jihe Expressway. It is an important transportation hub connecting T3 Terminal of Baoan International Airport, Jihe Expressway and Guangzhou-Shenzhen Expressway. In order to realize the connection between the speedway and the expressway system in the T3 area and improve the traffic capacity of the south airport Road, the transportation construction department of Shenzhen Municipality started the transformation project of Guangzhou-Shenzhen Expressway Hezhou Interchange project. The construction period is 2012.11.01-2013.06.01, the contract construction period is 437 days, and the project cost is 385.44 million yuan. Specifically, the width of the main subgrade of Guangzhou-Shenzhen Expressway is about 1.535km, and 7 new ramps with a total length of 6.353km, including 5 new Bridges, 12 new culverts, and 1 toll square and 1 card issuing square. As a key project in Shenzhen city, since the beginning of the year, according to the arrangement of the owner unit, the construction period of the main project has been adjusted from 437 days to more than 200 days. Faced with severe construction tasks, the Group carried forward the tenacious style of daring, daring and fighting, and overcome many difficulties in the construction process, such as many underground pipelines; many property units and tight time coordination; complicated geological conditions; rainy season, causing great interference to the earthwork, box culvert excavation and bridge construction; took strong measures to vigorously promote the project progress, completed the construction task with high standard and high quality, and delivered a satisfactory answer on schedule.